Mark H
Well-known member
I laid the slab for my new garage today,6mtr x 5mtr x150mm deep.It's a 35 Newton mix(whatever the hell that means!) and has a fibre additive.The garage walls are prefabricated timber frame panels and therefore require a timber sole plate.I plan on fixing the sole plate to the slab using stainless steel Hilti throughbolts.Question is,how long should I leave the slab to cure before drilling into it?
Thanks,
Mark.
Thanks,
Mark.
