A vapor barrier is always a good idea, lots of production guys don't like going with it because it takes forever and a day for the slab to set up so thay can finish it. The re-bar is overkill, big time. If I were pouring a 4 inch slab with fiber-mesh in the mix, I wouldn't even worry about the wire. The most important thing in preventing concrete cracks is to make sure that your fill is adequately compacted and you use control joints on larger slabs.