78C-10
Banned
Hello everyone, I have a 30x40 pole barn here in northern Illinois. I am in the process of getting quotes for a concrete floor. My first quote was $6200 but I would have to buy the 2" foam insualation for under the slab and around the slab. I would also have to rent the skidsteer for the contractor to use. He would be coming from Wisconsin and said it would be cheaper for me to rent a skidsteer versus him having to charge me to bring his skidsteer over the stateline. Something to do with the D.O.T and crossing statelines. It is for 5" of concrete, wire mesh and rebar at the posts, him doing the excavation for the perimeter foam and the under slab foam.
My second quote came today and it is for $8500! Holy ****! But....this includes him buying the foam and installing a simple floor drain(no floor drain in first quote). He is also going to do a frost wall under each overhead door. Is this something that is really needed? He said it has to do with frost heave, I haven't heard of that anywhere around this site or anywhere else.
I was just wondering if the frost wall under the overhead doors was really necessary, this may cut down on costs if it is not necessary. The floor drain isn't a necessity either. Thank you
My second quote came today and it is for $8500! Holy ****! But....this includes him buying the foam and installing a simple floor drain(no floor drain in first quote). He is also going to do a frost wall under each overhead door. Is this something that is really needed? He said it has to do with frost heave, I haven't heard of that anywhere around this site or anywhere else.
I was just wondering if the frost wall under the overhead doors was really necessary, this may cut down on costs if it is not necessary. The floor drain isn't a necessity either. Thank you

