bigsmith7227
Member
I have been searching around and haven't found anything similar to my situation. After I lay drain tile on the perimeter of my building to solve the water issue that is washing out my foundation. I want to pour a solid wall formed from 2 bys and plywood. My question is what are my options for tying the rebar into supporting beam and the floor? Pictures are shown below. Half of the wall is still intact, it doesn't seem to be getting worse. My plans were to fur out past everything and pour once. I just need input on the best way to keep everything stable and tied together with rebar. I've been told I need some type of plastic to block moisture from concrete against wood. My thoughts were to drill holes in the beam and into the floor prior to pour and tie it in that way. Fire away with your thoughts. Thanks