Concrete Sealer, before or after metal building install?

Phillips_211

New member
Joined
Aug 18, 2021
Messages
2
First time post here. A lot of useful information on this site. I am in the Process of Building a 30X40X13 tube style metal building. It will asked have a 12X40 lean to. I have pretty much decided on the Ghostshield densifier and sealer. My question to you all is should I put the densifier/ sealer down before the building is installed? Concrete is roughly two weeks old right now I’m still about a month out on the building.
 

Attachments

  • 79D421DB-75A2-4CFE-9FE7-B23B198A5B40.jpeg
    79D421DB-75A2-4CFE-9FE7-B23B198A5B40.jpeg
    837 KB · Views: 21
  • 80B9E8F8-1CF0-4931-974C-7DC7DA836D9E.jpeg
    80B9E8F8-1CF0-4931-974C-7DC7DA836D9E.jpeg
    573.1 KB · Views: 22
To avoid these ads, REGISTER NOW!

Armorpoxy

Well-known member
Joined
Aug 18, 2013
Messages
3,735
Location
NJ
Always do the floor last. In our experience the contractors damage the surface no matter how careful they are. Gostshield though being a penetrating product most likely wouldn't show any damage, but in our opinion wait until the building is completed.
 
OP
P

Phillips_211

New member
Joined
Aug 18, 2021
Messages
2
I guess that’s why I was wondering, since the sealer penetrates and doesn’t change the look of the concrete why wait till the building is already up?
 
To avoid these ads, REGISTER NOW!

FMB4

Well-known member
Joined
Jan 19, 2017
Messages
2,926
Typically, concrete should cure for at least 6 months before you seal or paint it. Some sources say a year.
 

entiatfan

New member
Joined
Oct 28, 2017
Messages
1
I just put on a 'Curing" sealer. Slab was poured 3 days ago and washed yesterday. The product is made by Eculid, Its called Everclear
 