Hey guys and girls
Before I make a huge mistake pouring this concrete slab I want to make sure it is NOT a mistake to begin with.
I am doing a monolithic pour on a 28x32 slab. We went 36" deep around the perimeter and formed it to length. When we setup the form, we have the width level from end to end (side to side). For drainage purposes, we sloped the length (back to front) at approximately 3" of drop.
I am thinking that it's going to be a pain when it comes to framing all around. Nothing is going to be square if I do this. I am by no means a builder, so I need some ideas.
Should I just readjust the forms to level before the pour? Or, am I making a MT out of a mole hill?
Any professional and productive advice is much appreciated.
Thanks
Before I make a huge mistake pouring this concrete slab I want to make sure it is NOT a mistake to begin with.
I am doing a monolithic pour on a 28x32 slab. We went 36" deep around the perimeter and formed it to length. When we setup the form, we have the width level from end to end (side to side). For drainage purposes, we sloped the length (back to front) at approximately 3" of drop.
I am thinking that it's going to be a pain when it comes to framing all around. Nothing is going to be square if I do this. I am by no means a builder, so I need some ideas.
Should I just readjust the forms to level before the pour? Or, am I making a MT out of a mole hill?
Any professional and productive advice is much appreciated.
Thanks