Concrete thickness

mnpeterg

Active member
Joined
Feb 7, 2024
Messages
38
Excavated and filled with class 5 today for a thickens footer slab (monolithic). The footers are supposed to be 12”x12”. The thickness of the slab I had planned to be 6”. Due to my skill level of the skid steer that I rented Tom Home Depot the thickness definitely varies 6 “ in most to 14 or so in others. Is that normal for diy’ers to have varying thicknesses? Certainly the top of the slab will be level it’s the thickness.

Rebar in the footers and slab.


Slab is for a larger shed.

Issue or simply an additional expense for the extra concrete?
 
To avoid these ads, REGISTER NOW!
OP
M

mnpeterg

Active member
Joined
Feb 7, 2024
Messages
38
The slab is16x30 and had a hard time with the whole dug too deep in one area thing.
 

Doubled33

Well-known member
Joined
Dec 29, 2021
Messages
228
Location
CA/HI/MS
Guys that do grade all day can get within a 1/10 of an inch. When I buy out earthwork the big boys have that number in their contract. I am not buying extra concrete.

Should be fine OK on thicker, but where is your rebar? Is it on the top or bottom of your thick parts or in the middle? My vote is to keep your rebar consistent at say 2” down from the top and maybe add a matt in the thicker part so you don’t have unreinforced concrete that is that thick. Which for your application is probably fine either way, but rebar is somewhat cheap especially compared to your concrete overage.
 

Renegade1LI

Well-known member
Joined
Mar 11, 2018
Messages
5,070
Location
long island ny
You're fine for diy, after excavating we go back and do a final grade with approved backfill. That gives a more uniform subgrade which is important for the correct placement of rebar.
 
To avoid these ads, REGISTER NOW!

ConCretin

Well-known member
Joined
Jan 20, 2011
Messages
3,381
Location
Central Maine
There's really no downside to thicker concrete other than cost but I agree with those that suggest bringing the base to the correct grade with compacted granular fill. It's not hard to do and will just make for a better job. Get a finer material that is easier to move around by hand and set up strings or use a laser to check your grade as you go. Plus or minus 1/4" would be just fine. Even the pro's rely on some hand work to get it that close.
 

PWC Repair

Well-known member
Joined
Dec 27, 2012
Messages
3,230
Location
Arkansas
I did my 30x48 myself and my concrete varies from 6-8" thick. I felt like that was close enough on the base to pour. How big will this be? 12x12 is a small footer.
 

Leaflessshadetree

Well-known member
Joined
Aug 1, 2013
Messages
7,219
Location
Don't ask.
It will be hard to estimate how much concrete you'll need if the thickness varies that much. Fill and compact the whole area. (IMO driving a skid steer around won't compact well enough).
 

rayra

Well-known member
Joined
Dec 1, 2014
Messages
4,724
Location
Escaped from Los Angeles
seconding racecougar, that much variance is going to screw up any concrete yardage estimate pretty badly. You should try to get the level corrected to within a couple inches. Otherwise you might need twice as much concrete as anticipated and you might not get it in time because the yard is supplying multiple jobs concurrently and a follow-up truck for your gross mistake might not come in time for your pour. Then you;ll be posting a topic about your screwed up slab / cold joint etc.
 

Prospecter

Well-known member
Joined
May 16, 2015
Messages
2,548
Location
Maine
As a DIYer, I usually set up a screed and use sand for the final leveling. But then, with my current project, I hired the work out, so there's that!
 