I'm thinking of building a larger shop, somewhere around 50x100 and was thinking about doing it in two steps. Settling on the way I want it, placement, design etc... and doing the site prep, concrete, and running power to it this year before the summer is over.
Does anyone foresee any issues with this train of thought? I'm in the northwest where the ground does freeze and we get about 40" of annual snowfall. I wasn't sure if I should be concerned with anything going this route. Please feel free to openly share opinions/suggestions.
I'll probably go with metal infrastructure vs wood as it seems more cost effective on a shop that size, so I'll likely have to have an "engineered" pad.
Does anyone foresee any issues with this train of thought? I'm in the northwest where the ground does freeze and we get about 40" of annual snowfall. I wasn't sure if I should be concerned with anything going this route. Please feel free to openly share opinions/suggestions.
I'll probably go with metal infrastructure vs wood as it seems more cost effective on a shop that size, so I'll likely have to have an "engineered" pad.