Hello and thank you in advance for any technical guidance provided, especially on the electrical side of this project (I am strictly a mechanical mind).
Kitsap County has issued my building permit and we will be breaking ground on a 40' x 40' shop today. This will include a trench from the existing garage to the shop for the electric feed. I am looking for guidance on what conductors I should run from the existing panel (photo attached) to the sub-panel, what size breaker should be used, and if the conductors should be ran in conduit. I am looking at the Eaton Type CH 125-Amp 24-Spaces 48-Circuit Main Lug Plug-On Neutral Load Center for the sub-panel.
The distance between the two panels is approximately 40'. Not exactly sure what loads will be on the panel and I don't want to be short on the supply. I am hoping to have dust collection, table saw, small lathe, Bridgeport style knee mill, air compressor, small mig welder and maybe some other cool toys.
I imagine I have forgot to supply some critical piece of information so let me know.
Brian
Kitsap County has issued my building permit and we will be breaking ground on a 40' x 40' shop today. This will include a trench from the existing garage to the shop for the electric feed. I am looking for guidance on what conductors I should run from the existing panel (photo attached) to the sub-panel, what size breaker should be used, and if the conductors should be ran in conduit. I am looking at the Eaton Type CH 125-Amp 24-Spaces 48-Circuit Main Lug Plug-On Neutral Load Center for the sub-panel.
The distance between the two panels is approximately 40'. Not exactly sure what loads will be on the panel and I don't want to be short on the supply. I am hoping to have dust collection, table saw, small lathe, Bridgeport style knee mill, air compressor, small mig welder and maybe some other cool toys.
I imagine I have forgot to supply some critical piece of information so let me know.
Brian