Fergiebear13
Member
- Joined
- Nov 9, 2021
- Messages
- 14
So from the outside of my shop to the ground is higher than the inside because it's on a slope. Still gravel floor no concrete to level it yet. The height of my panel inside is to code, but where the midline of the meter falls on the outside is out of code spec so had to move it. I need to know if this is going to be code to use this method to come from the bottom of the meter combo and go up to the hold in the shop where the back of the panel meets. This is my first rodeo and I'm out of ideas. Passing inspection is the goal.lol Thanks in advance.