Gettin ready to put my Sub in...using qty 4 of the 4ga THHN I have. Using this chart: http://www.westernextralite.com/resources.asp?key=47 1" EMT should be fine...but at max. Should I go with 1" being at max, or would you go with 1.25" for the heck of it.
Is it OK to mix & match conduit? meaning can I use standard EMT where feasible...use a 2' piece of Flex where needed, back to EMT for a stretch, back 'nuther Flex piece where needed...etc...
EMT/Conduit as a whole in Walls...will be insulated & sheetrocked. I've read numerous comments about derating cables and what have you, do I need to think about derating? Conduit will go up from my current 100A Panel, up into the attic...Winter time means wicked cold up there, summers, bit hotter
Is it OK to mix & match conduit? meaning can I use standard EMT where feasible...use a 2' piece of Flex where needed, back to EMT for a stretch, back 'nuther Flex piece where needed...etc...
EMT/Conduit as a whole in Walls...will be insulated & sheetrocked. I've read numerous comments about derating cables and what have you, do I need to think about derating? Conduit will go up from my current 100A Panel, up into the attic...Winter time means wicked cold up there, summers, bit hotter