I goofed up.
On my 20’ conex, I finished out the walls with 2x4 walls and polyiso insulation. Then I covered it with 3/4 ply.
But, I forgot to mark the location for the tie down dealies and I’d like to attach to them.
I can drill a 3” hole and attach but I need to know exactly where they are.
I suspect they are pretty standard.
Any clever ideas on how to figure this out? I’m not able to find any blueprints or line drawings of a conex with these points illustrated.
Thanks