97CV
Well-known member
Just had a contractor out here this AM.
D&S Masonry in MI.
I told him I wanted a lift put it and we talked rebar, he replied "That's all we do" , which I liked.
I asked him about 4" or 5" and he stood by his 4/rebar flat work.
Does this sound strange to anyone else that a contractor turned down a more expensive project?
Yes I am putting a lift in, but I am not going to be running a city maintenance garage either.
Is 4" ok?
He states his mix is 4000PSI too.
D&S Masonry in MI.
I told him I wanted a lift put it and we talked rebar, he replied "That's all we do" , which I liked.
I asked him about 4" or 5" and he stood by his 4/rebar flat work.
Does this sound strange to anyone else that a contractor turned down a more expensive project?
Yes I am putting a lift in, but I am not going to be running a city maintenance garage either.
Is 4" ok?
He states his mix is 4000PSI too.