I have a local welder building me a partially finished shop (framing, insulation, drywall, electrical rough in, plumbing rough in) in rural north TX. The project started ok, with foundation / metal / framing work done fairly quick, then I have been waiting for the subcontractors for almost 3 months.
1 month waiting for builder to schedule a time for me to discuss the work with electrician / plumber
another month after I met the electrician / plumber, still no quote / confirmed date to do the work
Plumber told me "next week" several times and did not respond to calls on the week he was supposed to show up (who told me he would get to it in 1 or 2 weeks when I first met him). How much should I expect to plumb a bathroom?
Electrician responded a month after I met him saying I needed to wait another month and it takes 10 days to do electrical for the 30x40 metal building. Isn't this 2 days of work at most for electrical rough in (panel, metal conduit for exposed wires / romex for finished space)?
I am getting kinda frustrated that the build taking much longer than I thought and still have no idea when it will finish. It's me chasing the subcontractors with the builder basically did a referral... Is my experience with contractors common (unresponsive, no show) these days?
I didn't sign a construction contract (small town, trusted the local builder recommended by word of mouth) for this build now I kinda regret not selecting a more organized or even turnkey builder. Should I just find my own contractors to finish the project or they are all occupied with more profitable projects like commercial buildings? It's my first build, I don't really know what to expect.
1 month waiting for builder to schedule a time for me to discuss the work with electrician / plumber
another month after I met the electrician / plumber, still no quote / confirmed date to do the work
Plumber told me "next week" several times and did not respond to calls on the week he was supposed to show up (who told me he would get to it in 1 or 2 weeks when I first met him). How much should I expect to plumb a bathroom?
Electrician responded a month after I met him saying I needed to wait another month and it takes 10 days to do electrical for the 30x40 metal building. Isn't this 2 days of work at most for electrical rough in (panel, metal conduit for exposed wires / romex for finished space)?
I am getting kinda frustrated that the build taking much longer than I thought and still have no idea when it will finish. It's me chasing the subcontractors with the builder basically did a referral... Is my experience with contractors common (unresponsive, no show) these days?
I didn't sign a construction contract (small town, trusted the local builder recommended by word of mouth) for this build now I kinda regret not selecting a more organized or even turnkey builder. Should I just find my own contractors to finish the project or they are all occupied with more profitable projects like commercial buildings? It's my first build, I don't really know what to expect.