I like the idea of filling control joint prior to coating floor with epoxy. so I can have nice seamless floor but here is the concern
If control joint is filled with some solid but flexible filler so when there is movement on slab
occurs it can provide flexibility but when epoxy is applied on top of this filler, epoxy is stronger then concrete and it is bonded with concrete very well so when there is a movement it may crack since epoxy coat doesn't have flexibility same as filler inside the joints.

What do you guys think?
Scotty I know you have great 821 gel style filler but how would it address this.

Thanks in advance.

-nomogy
 
To avoid these ads, REGISTER NOW!

Carnut12

Active member
Joined
Feb 14, 2010
Messages
40
Location
MA
If you go into a warehouse like a Home Depot all of there expansion joints are filled, but I am not sure what they use to fill them. It may be silicone which would not allow the epoxy to stick. I am also trying to fill mine prior to doing a floor, but I am not sure what floor I want to go with yet.
 
To avoid these ads, REGISTER NOW!

Bones35

Active member
Joined
Feb 10, 2011
Messages
28
Location
Fayetteville AR
If you know you have a section of slab that moves when say a 5000 lb scissor lift rolls off and on it. What product should you use to keep any moisture out?
 