I am replacing the copper pipe in my house with PEX. I am not sure about the connections to the hot water boiler. The 3/4 cold line from my pressure tank runs up to the boiler, but for some reason necks down 3/8 before entering the boiler and the reducer valve. On the hot outlet to the house hot supply, it is also 3/8 for a short run before entering a 3/4 trunk.
I think I should eliminate the 3/8 sections and replace them with 3/4. I think everything should be 3/4 up to the PEX home run manifold, then 1/2 or 3/8 lines from the home run manifold. Am I missing something?
Thanks!
Ed
I think I should eliminate the 3/8 sections and replace them with 3/4. I think everything should be 3/4 up to the PEX home run manifold, then 1/2 or 3/8 lines from the home run manifold. Am I missing something?
Thanks!
Ed