I searched but didn't find anything, recently picked up a house with a 36 x 48 semi attached pool house. I plan on filling the pool in and pouring a slab hopefully to meet the remainder of the existing floor but I may end up skimming the entire thing. Has anyone ever done this? Any compaction or settling issues in the long run? Anything else to think or worry about? The building is heated and air conditioned which is a plus too.
Attachments
Last edited:


