Hagatronics
Well-known member
I've got a gate post that is slowly leaning back - its' moved to about 20mm off plumb over 2m over the past several years.
I know the right answer is to dig out the post and re-concrete it, maybe using a longer post in a deeper hole. But that seems like a lot of work.
It's 100x100x3mm mild steel. Could I just cut in near the base and MIG/ARC weld it back straight? It's leaning directly back so I'd cut a wedge and the weld the three cut sides.
Looking for opinions, seems too easy a solution...
I know the right answer is to dig out the post and re-concrete it, maybe using a longer post in a deeper hole. But that seems like a lot of work.
It's 100x100x3mm mild steel. Could I just cut in near the base and MIG/ARC weld it back straight? It's leaning directly back so I'd cut a wedge and the weld the three cut sides.
Looking for opinions, seems too easy a solution...
Attachments
Last edited: