2 weeks to the day I had my slab on grade poured, and to my discontent there are at least 4 cracks starting to form from the outer edges working their way in. They appear to be starting close to the middle portions of the slab. I had control cuts placed diagonally from the 4 corners of the slab to the corners of my sump.
I realize it's the nature of concrete to crack as it cures and shrinks... but 2 weeks after the pour? I figured I'd at least get a year or 2 before seeing this.
I checked over my concrete invoice and the contractor had used 30MPA with 20 mm aggregate and 110 mm slump.
Is this likely shrinkage cracking? Could the high slump be a likely cause?
It was poured in ideal conditions. 100% humidity, cool weather with no sunlight and minimal wind. They sealed it and it rained quite a bit 24 hours later.
I realize it's the nature of concrete to crack as it cures and shrinks... but 2 weeks after the pour? I figured I'd at least get a year or 2 before seeing this.
I checked over my concrete invoice and the contractor had used 30MPA with 20 mm aggregate and 110 mm slump.
Is this likely shrinkage cracking? Could the high slump be a likely cause?
It was poured in ideal conditions. 100% humidity, cool weather with no sunlight and minimal wind. They sealed it and it rained quite a bit 24 hours later.