I want to do an epoxy coat to my 30 x 44 shop floor. The floor has several cracks, 2 low spots that collect water when I wash ( and I wash a lot) and some surface dusting in the one side that is used for parking in winter, welding, ect.
My time is very limited so I’m wanting to do this in stages but unsure if it’s totally possible.
Is it possible to do the repairs over winter and do the final grind/ epoxy in spring? I’m sure the crack repair is no problem but I’m more wondering about the low spots and dusting, if I were to repair do those areas need an epoxy over them to protect them?