My shop is currently being excavated for now.
The design is a slab on grade and I mentioned to the contractor that I wanted to have a 6" "curb" poured around the perimeter for the walls to sit off the floor. My contractor doesn't think it's necessary as he uses sill plate gasket and vapour barrier wrapped a foot of so up the wall.
Thoughts?