So, I laid a six inch concrete slab four weeks ago and 90% of it has dried to the point it is now an off-white. There are still some small patches of dark grey etc which I suspect to be places where it is still moist or uncured?
Anyway, I picked up my Atlas OH9000 last week and have it sitting on car dollies, awaiting installation.
The thing is this, whilst I laid the bulk of the slab at six inches, I dug deeper for 10-12 inch footers for the two lift columns. As such I am considering whether I should leave it another month before installing.
Anyone been here and if so did you get any recommendations as to the delay before installation when having deeper than usual footers?
The photos here despite the fairly awful focus do give you an idea as to what I mean...
Paul
Anyway, I picked up my Atlas OH9000 last week and have it sitting on car dollies, awaiting installation.
The thing is this, whilst I laid the bulk of the slab at six inches, I dug deeper for 10-12 inch footers for the two lift columns. As such I am considering whether I should leave it another month before installing.
Anyone been here and if so did you get any recommendations as to the delay before installation when having deeper than usual footers?
The photos here despite the fairly awful focus do give you an idea as to what I mean...
Paul