So I am going to have my slab poured for my 28' x 28' garage on Saturday the 27th.
4" slab with rebar on 24" grid w/ vapor barrier & 2" foam under
slab will be sloped to the overhead doors.
Plan is to flood cure.
a) poly with 2x8's across door ways to seal up the entries (will this seal good enough)
b) flood with water to 4-6"
c) cover with tarp to slow evaporation & keep cooler
d) check levels and keep flooded for 5-7 days
Slab is being poured before the garage is framed - to make it easier for working on the framing. I am doing everything except the concrete work on this project.
Anything you would do differently?
I will be treating the concrete with Ghostshield 4500 & 8510 once properly cured.
4" slab with rebar on 24" grid w/ vapor barrier & 2" foam under
slab will be sloped to the overhead doors.
Plan is to flood cure.
a) poly with 2x8's across door ways to seal up the entries (will this seal good enough)
b) flood with water to 4-6"
c) cover with tarp to slow evaporation & keep cooler
d) check levels and keep flooded for 5-7 days
Slab is being poured before the garage is framed - to make it easier for working on the framing. I am doing everything except the concrete work on this project.
Anything you would do differently?
I will be treating the concrete with Ghostshield 4500 & 8510 once properly cured.
Attachments
Last edited: