Mordi
Well-known member
Sometime in the future, I would like to build a built in stone BBQ island in my backyard. The area I have in mind is a stamped concrete pad located under open air patio, adjacent to the house. The concrete on the patio is approx. 4 inches thick and reinforced with rebar.
1) Can I use the existing stamped concrete pad as footing or the new BBQ build or do I need to cut and remove the exisiting concrete and build a new footing?
2) If I need to build a new footing, what tool should I use to cut the concrete? I see that HF has a 4.5" heavy duty angle grinder for $20 - will that, along with a diamond blade be suitable for the task? If not, is there another tool or brand of tool I should consider?
Thanks,
Mordi
1) Can I use the existing stamped concrete pad as footing or the new BBQ build or do I need to cut and remove the exisiting concrete and build a new footing?
2) If I need to build a new footing, what tool should I use to cut the concrete? I see that HF has a 4.5" heavy duty angle grinder for $20 - will that, along with a diamond blade be suitable for the task? If not, is there another tool or brand of tool I should consider?
Thanks,
Mordi