Got some clarification of some details...
The refundable part: It is 100% refundable on day 1. After that they deduct their time and cost from how much is refundable. So after they complete the bid there is close to nothing left to refund.
They said the $5000 was the rate because we already had plans. It would be 50 - 100% more without plans.
I understand them not wanting to put in large amounts of time but I think we should get more than a rough guess on cost per square foot before we put this kind of money down. We are looking at other contractors.
The difference between this and buying a car or appliance is that the design work is already complete for those so not really a valid comparison IMHO.
The refundable part: It is 100% refundable on day 1. After that they deduct their time and cost from how much is refundable. So after they complete the bid there is close to nothing left to refund.
They said the $5000 was the rate because we already had plans. It would be 50 - 100% more without plans.
I understand them not wanting to put in large amounts of time but I think we should get more than a rough guess on cost per square foot before we put this kind of money down. We are looking at other contractors.
The difference between this and buying a car or appliance is that the design work is already complete for those so not really a valid comparison IMHO.