JBjunior
Active member
I am a military member currently stationed about 4500 miles away from my property and I am trying to start initial planning for a detached building that I want to build in a few months. The property is in NC (Onslow County) and I am having a hard time understanding the codes and telephone conversations will be long and drawn out, I have already asked some initial questions from them.
There are already two homes on the property, this is being planned as a hang out spot/workshop area.
Here is what I already know: It will have to be on a slab with footers. I am looking at putting a pseudo "yurt", a round building, that is around 1000 sf, that will be heated and cooled. I want it is stout as possible for hurricanes (one of the benefits of the round building). I will have assistance from a professional carpenter, just not someone that is familiar with NC code (family member out of the area).
1) For a round building, how hard is it (cost from a contractor) to do a round concrete pad with footers vs a slightly larger square/rectangle pad to accommodate the building?
2) I plan on hiring someone to do the pad, but what kind of practice should they carry out in NC for vapor barrier, depth, fill material, etc.?
3) What is the preferred method for attaching the frame to the pad? Embedded anchors, drilling. What is preferred within what is allowed within code?
If anyone has any questions, concerns, or advice.... feel free to post.
Basically, something along these lines:
There are already two homes on the property, this is being planned as a hang out spot/workshop area.
Here is what I already know: It will have to be on a slab with footers. I am looking at putting a pseudo "yurt", a round building, that is around 1000 sf, that will be heated and cooled. I want it is stout as possible for hurricanes (one of the benefits of the round building). I will have assistance from a professional carpenter, just not someone that is familiar with NC code (family member out of the area).
1) For a round building, how hard is it (cost from a contractor) to do a round concrete pad with footers vs a slightly larger square/rectangle pad to accommodate the building?
2) I plan on hiring someone to do the pad, but what kind of practice should they carry out in NC for vapor barrier, depth, fill material, etc.?
3) What is the preferred method for attaching the frame to the pad? Embedded anchors, drilling. What is preferred within what is allowed within code?
If anyone has any questions, concerns, or advice.... feel free to post.
Basically, something along these lines: