garage guy1of38
Well-known member
I'm nearing the finish line on my detached car storage/shop build.
Today was day one of a four day Audio, video, CCTV and alarm install.
Today they got the equipment rack in place and started interconnecting local wiring and one of the large tvs mounted.
Next few days will be tying it into the house system (over fibre between buildings) CCTV system, alarm and lighting system programming.
Here are some quick pics. I'll take better pics once trades are gone and shop has been cleaned.
Today was day one of a four day Audio, video, CCTV and alarm install.
Today they got the equipment rack in place and started interconnecting local wiring and one of the large tvs mounted.
Next few days will be tying it into the house system (over fibre between buildings) CCTV system, alarm and lighting system programming.
Here are some quick pics. I'll take better pics once trades are gone and shop has been cleaned.
