I'm building a detached garage soon. I plan on tapping off my meter base and running buried feeder cable to the garage. My power company has okayed this as Milbank makes a double tap for my meter (K4977-Int). My only concern is that I also want to upgrade to 400 Amp service in the future and 200 Amp service in the garage. The Milbank tap only accepts 1/0 wire, but 4/0 wire is hardly more expensive and can handle the future 200 amp service. Is it okay to use a wire reducer for now, install the 200 Amp breaker box in the garage and run with it for a few years. Upgrading the whole service right now will break the budget and the garage will have to wait a year. Or have no power for a year.