nissan_crawler
Well-known member
With all this talk in the extension cord thread about the amount of wires and such, I'm curious about something...
when I ran all of the wiring for my 5 240 circuits...I ran 4 wires (2 hots, neutral, ground). However, all mine are the 10-30p outlets, so the one wire isn't used, and is just rolled up in the box and panel. I also ran 6 gauge, even though 4 are 30 amp, and one is 40 amp (plasma, called for 40 amp, but had the 10-30p plug). I did the extra wire and 6 gauge just in case things change later. The breakers and outlets are for the proper machine amperage, not for the wire.
Is this to code, or should the extra wire not technically be there, and the gauge only be 10/8?
I assumed at the time that it certainly couldn't matter, but after reading that thread, I'm second guessing things. It seems the code maybe isn't quite as common sense as I thought. One of these is for my (old) dryer, which is what started me thinking about adding the fourth wire for when it croaks, and I figured I might as well run it for everything, in case that stuff changes later. Maybe thinking ahead is against code, though...
when I ran all of the wiring for my 5 240 circuits...I ran 4 wires (2 hots, neutral, ground). However, all mine are the 10-30p outlets, so the one wire isn't used, and is just rolled up in the box and panel. I also ran 6 gauge, even though 4 are 30 amp, and one is 40 amp (plasma, called for 40 amp, but had the 10-30p plug). I did the extra wire and 6 gauge just in case things change later. The breakers and outlets are for the proper machine amperage, not for the wire.
Is this to code, or should the extra wire not technically be there, and the gauge only be 10/8?
I assumed at the time that it certainly couldn't matter, but after reading that thread, I'm second guessing things. It seems the code maybe isn't quite as common sense as I thought. One of these is for my (old) dryer, which is what started me thinking about adding the fourth wire for when it croaks, and I figured I might as well run it for everything, in case that stuff changes later. Maybe thinking ahead is against code, though...