I'm getting ready to trench using a ditch-witch from a new pole to the building which is a fairly straight run of approx 225ft. I'm doing a second ditch from the house that'll tie into the the one from the from the pole. I was planning to do everything at 48" and drop water first. BAckfill to 24" and drop direct burial on top along with some cat5/cable from the house in conduit.
I already purchased direct burial cable to do the job. Should I be concerned about future failures due to frost causing issues (NJ)? I guess I could get it in 2 1/2 or 3" but rather not if it's not needed. Anyone know if the Cat5/cable will be usuable at a run of 325ft from the house? I'd rather not pay the cable company for separate service on the pole too. The electric company already handed me my @ss LOL.
I already purchased direct burial cable to do the job. Should I be concerned about future failures due to frost causing issues (NJ)? I guess I could get it in 2 1/2 or 3" but rather not if it's not needed. Anyone know if the Cat5/cable will be usuable at a run of 325ft from the house? I'd rather not pay the cable company for separate service on the pole too. The electric company already handed me my @ss LOL.