I finally got my permit approved and issued. I have some questions about my site and what I should do. I had a dozer come in and "level" my site. Well long story short the builder is now saying since there is some fill dirt used to make my site level there is gonna be some additional costs.
Does that sound normal?
I have posted some before and after pictures. Basically we moved dirt from the right to left. I needed to take some from the hill to be able to drive in so he just spread it out. At first the builder was saying there is 3 feet of fill and I said no way. So I went out and dug some holes, not exact but (see the attached) the bottom hole is about 18 or 19 inch of fill not compacted. I sent him these same pictures and he said he would get back to me.
Guess my question is what are my options?
1 I could move my building closer to the hill (right) to stay farther away from the left side fill.
2 Pay the dirt guy to move the dirt I just paid him to put there and try to get to "undisturbed soil" but probably have some drainage issues
3 Pay the extra money to the builder due to the fill
Change order price for accommodating the longer post due the fill on site is $1466.00. That includes the difference in cost for the posts, the extra concrete, allowance for the additional time for drilling deeper holes and drill bit extensions.
Does that sound normal?
I have posted some before and after pictures. Basically we moved dirt from the right to left. I needed to take some from the hill to be able to drive in so he just spread it out. At first the builder was saying there is 3 feet of fill and I said no way. So I went out and dug some holes, not exact but (see the attached) the bottom hole is about 18 or 19 inch of fill not compacted. I sent him these same pictures and he said he would get back to me.
Guess my question is what are my options?
1 I could move my building closer to the hill (right) to stay farther away from the left side fill.
2 Pay the dirt guy to move the dirt I just paid him to put there and try to get to "undisturbed soil" but probably have some drainage issues
3 Pay the extra money to the builder due to the fill


) that makes the poles longer.