Feeder distance allowed inside bldg before breaker panel
Does the NEC prohibit an 11' run inside a building before the feeder enters the breaker panel?
I'd like to enter my detached building near the corner closest to the house panel.
I'm using MHF in scd 40 conduit, with sch 80 coming out of the ground to an LB.
Inside, I'd then run 11' of scd 80 behind a stairway to the panel which will have the requisite access spacing as the stairway rises.
If I trench to the area directly behind this panel location, I have a buried gas line to deal with.
I'm hanging the panel this weekend so any thoughts?
Does the NEC prohibit an 11' run inside a building before the feeder enters the breaker panel?
I'd like to enter my detached building near the corner closest to the house panel.
I'm using MHF in scd 40 conduit, with sch 80 coming out of the ground to an LB.
Inside, I'd then run 11' of scd 80 behind a stairway to the panel which will have the requisite access spacing as the stairway rises.
If I trench to the area directly behind this panel location, I have a buried gas line to deal with.
I'm hanging the panel this weekend so any thoughts?
Last edited: