This will be a slab for a future shed. At this point its 18'x11' and will eventually be larger with more sections added. I am breaking it into smaller pieces to manage it and also minimize the impact in case something goes really bad. Going to do as much of the slab as I can on my own; Very hard to get call backs around here for "smaller" work since the construction biz is still booming. Really dont know what I am doing but Youtube has given me confidence (perhaps false)
My lot has a fair bit of slope (about 1:10) so have to deal with that. I was able to find a guy on marketplace who works a bobcat and he did a decent job levelling the area and stripping the topsoil. And so with about 15 yards of gravel delivered and spread by hand along with renting plate compactor, I had a half decent subgrade.

My lot has a fair bit of slope (about 1:10) so have to deal with that. I was able to find a guy on marketplace who works a bobcat and he did a decent job levelling the area and stripping the topsoil. And so with about 15 yards of gravel delivered and spread by hand along with renting plate compactor, I had a half decent subgrade.