Hi All
When inspector was round doing pre-pour, he mentioned he'll be looking at nailing patterns on sheathing and expects 2 columns interleaved 3-inch apart, as shown here: http://www.all-concrete-cement.com/shear-wall.html
What i'm not clear about is would the double column just be at the ends of the WALL, or the ends of each sheet, (so four columns -- 2 per sheet -- where sheets join). If the latter, I'd have to use double studs at each sheet joint wouldn't I?
Thanks
Mark