OP
Don Campbell
Well-known member
Fall in Northern Michigan , I been working on the Gator and got the shift linkage all figured out and assembled. Also got the new low profile gas tank mounted. Also got the brakes all connected. Now I am working on the exhaust system . Should get that done tomorrow and I will move on to the hydraulic dump cylinder design. Then the rear wheel adaptors, then I will build a roll cage and mount the roof on . Then I will lift the front axle 6 inches for more ground clearance. Fun project.




