Well, its been a while. If your still checking in on my thread, thanks for sticking with it.
I have made some progress over the last few months, culminating in time off from work to hopefully get the drive finished.
So whats new, I first poured a concrete plinth for the sliding gate to move on, this also makes a nice sturdy entrance on to the pavement.
i want to put a note in to say this is my first attempt at either concrete or brick work. please if you notice any glaring mistakes, please point them out, i am happy to take on board any advice/criticism.
Filled the hole with the left over ********:
I have installed charcoal edging blocks on a bed of concrete, making a perimeter for the drive and path:
We even tidied the garden a little, we have a second Beagle shaped helper who likes to spread wood and rubbish so needed to clear it up. We wondered where the two of them had disappeared to and found them in on the spare bed!
On Monday we had 10 tones of type 1 (sub base) delivered to back fill the nice hole we excavated. Turns out we needed one more jumbo bag which arrives tomorrow.
End result from Mondays efforts:
And where i finished today. Drainage all but finished apart from a soak away pit that will come later down the line:
So tomorrow i will be cementing in the drainage channels and forming the slope away from the garage entrance with sub base. In readiness for the black slate slabs that have been ordered. These will be laid on a bed or black mortar for added strength.
I will keep the progress updated over the next week or so and hopefully i will have the drive completed by the time i go back to work. Just need the slate to arrive early next week.
Thanks for reading.