There is an installation document from Huber for their Advantech system. Just search the google for '2-Layer Subfloor with AdvanTech.' Even though their stuff is tongue and groove, if it were me, I would use this method. Like it says, I don't think adhesive is needed between the two layers, only on the first. The part about having it dried in though before the second layer is most important. I used Advantech 1-1/8" and I'm happy with it, although I had to put more screws in after I got the roof on because it swelled from a bit too much rain.
Sent from my LIO-AN00 using Tapatalk