VietGnome
Well-known member
Due to insulation from slab, and variance in the slab I'm going to need to come out 2" in some places, and 4" in others. Is my best bet to just size for the largest and run a 4" wide Z-trim the whole way around the building?
If thats the case should I have the bottom trim angle back towards the building so it can seal against any variance?
Or should I be custom fitting?

If thats the case should I have the bottom trim angle back towards the building so it can seal against any variance?
Or should I be custom fitting?


