Hi Everyone, I was curious as to how long it took for your concrete to dry after power washing/etching etc. ?
I spent 2 days cleaning/washing/etching/rising my garage floors. It has now been 4 days of drying and I can still see some wet (darker spots) in several areas of my floor.
I know to perform the moisture test (duct tape plastic sheet down) before applying epoxy to check for moisture in the slab. I haven't even bother to do that yet, as I can visually see there is still moisture at this point.
Really just curious as to how long I should be anticipating.. Guess I really soaked my floor good.
Drying method has been leaving the garage door open sun up to sun down. Avg daily high 70f and 35% humidity.
Just today I rented one of those carpet blowers to help move some air across the surface.
I spent 2 days cleaning/washing/etching/rising my garage floors. It has now been 4 days of drying and I can still see some wet (darker spots) in several areas of my floor.
I know to perform the moisture test (duct tape plastic sheet down) before applying epoxy to check for moisture in the slab. I haven't even bother to do that yet, as I can visually see there is still moisture at this point.
Really just curious as to how long I should be anticipating.. Guess I really soaked my floor good.
Drying method has been leaving the garage door open sun up to sun down. Avg daily high 70f and 35% humidity.
Just today I rented one of those carpet blowers to help move some air across the surface.