Need some help plumbing condensate lines for Furnace and on demand water heater.
Furnace used to dump into a garden hose snaked across basement. I added a neutralizer and pump, which has a small check valve, clear tubing in a loop and then a barb fitting into a piece of 1" PVC that daylights over in the utility sink.
On demand heater is on the opposite wall of utility room, no good way to gravity drain to the existing pump at the furnace. Was going to add a 2nd pump, but how do I tie this in?
Can I just wye into the existing PVC, add an upstream check on each pump and call it good?
Do I even need check valves, aside from right at the pump?
What if I wanted to tie these into the main sanitary line? I didn't do this initially as it was a trainwreck (mix of PVC, fernco and rubber hose) that has since been re-done.
Furnace used to dump into a garden hose snaked across basement. I added a neutralizer and pump, which has a small check valve, clear tubing in a loop and then a barb fitting into a piece of 1" PVC that daylights over in the utility sink.
On demand heater is on the opposite wall of utility room, no good way to gravity drain to the existing pump at the furnace. Was going to add a 2nd pump, but how do I tie this in?
Can I just wye into the existing PVC, add an upstream check on each pump and call it good?
Do I even need check valves, aside from right at the pump?
What if I wanted to tie these into the main sanitary line? I didn't do this initially as it was a trainwreck (mix of PVC, fernco and rubber hose) that has since been re-done.