I'm building a small shop (600sqft) and have to have a new meter because my house panel is too full.
Duke Energy needs me to fill out a load sheet and I can't get in touch with my electrician, has finished his part and passed inspection, and now I can't get in touch with him. Can anyone help me fill in the parts that are in the attached pic?
It is a hobby shop with normal woodworking tools.
Any help would be great. Thanks!
Duke Energy needs me to fill out a load sheet and I can't get in touch with my electrician, has finished his part and passed inspection, and now I can't get in touch with him. Can anyone help me fill in the parts that are in the attached pic?
It is a hobby shop with normal woodworking tools.
Any help would be great. Thanks!
Attachments
Last edited:
Makes absolutely no sense...