brianpgriset
Well-known member
Having my slab poured in a few weeks for a new shop. I am planning on putting two 4" dust collection pipes in the floor for table saw and planar. I want the PVC in the wall. Walls will be 2"x6", so that doesn't leave alot of room for error.
I've never done this before, so this might seem obvious but I'd think it's worth asking; I should have the 4" PVC stub up in the middle of the wall right? 3/4" isn't alot of room for play.
Should I move to 3"? Or just not come out of the wall? For those who did similar (in floor dust collection to wall), how did you do it?
I've never done this before, so this might seem obvious but I'd think it's worth asking; I should have the 4" PVC stub up in the middle of the wall right? 3/4" isn't alot of room for play.
Should I move to 3"? Or just not come out of the wall? For those who did similar (in floor dust collection to wall), how did you do it?
