fastbike02
Well-known member
As some of y'all might have seen in my other post I had issues with the contractors getting stuck in my yard but besides that I quite please with the building. I plan on adding extra braces inside and insulating it when the rain stops. I would have took more pictures but it started pouring soon as I get everything inside the shop.
This was concrete being poured, I didn't take pictures of the forming bc I did it myself and I worked like a rented mule to get it done in time
This was the contractors, they worked well into the night to get the building 90% done
This is what I got for just under 4K, I think it was a great deal myself
Hopefully soon I will post pics of interior and the rest of the build
This was concrete being poured, I didn't take pictures of the forming bc I did it myself and I worked like a rented mule to get it done in time
This was the contractors, they worked well into the night to get the building 90% done
This is what I got for just under 4K, I think it was a great deal myself
Hopefully soon I will post pics of interior and the rest of the build