gtae07
Well-known member
I'm starting to plan for my electrical while stuck inside sick... thoughts and advice appreciated.
It's looking like I'm going to get new 200A service, so that's not an issue. Lighting is planned as 9x twin 4' T8 fixtures with 6500k daylight bulbs, in banks of 3. Outdoor lighting around all doors, possibly with motion sensors.
240V outlets are square with amperage ratings; 120V outlets are circles with circuit identifier. The big 240V outlet between the doors is for a welder; the two in the back right corner are for lathe/mill (eventually), and the lower right is for a compressor. Two ceiling outlets in the middle are for pulldown cords or other use. Breaker panel and meter in lower left corner of the drawing. House is towards the bottom of the page. I may include one more 30A 240 circuit outside in a box for a future mini split.
It's looking like I'm going to get new 200A service, so that's not an issue. Lighting is planned as 9x twin 4' T8 fixtures with 6500k daylight bulbs, in banks of 3. Outdoor lighting around all doors, possibly with motion sensors.
240V outlets are square with amperage ratings; 120V outlets are circles with circuit identifier. The big 240V outlet between the doors is for a welder; the two in the back right corner are for lathe/mill (eventually), and the lower right is for a compressor. Two ceiling outlets in the middle are for pulldown cords or other use. Breaker panel and meter in lower left corner of the drawing. House is towards the bottom of the page. I may include one more 30A 240 circuit outside in a box for a future mini split.