My deatached garage is now done and ready for use. I am starting to look into and plan how I will add power to it.
I think the best idea would be to dig a trench and run 3 2awg wires in a conduit to a sub panel. It is only about 60' from the house to the garage and I am sure I could dig it by hand without too much trouble.
I want to run 100a to my garage. I plan to have a 220 compressor right away and will have a 220 welder and a lift in the years to come.
My house currently has a 125A service with a breaker box that is just about full. But does have room for a 100a 2 pole breaker.
I will have to upgrade the service to the house to 200a. I am farily knowledable in adding circuits and running wire, etc but have never done this before.
I spoke with the electric company and they said it is fairly easy from their side to upgrade the service. They will supply me with a meter box/plate and then when I am ready they will come and take care of everything outside. Upgrade wire from the poll if needed, at no charge.
So...what I am wondering is can I use my current breaker box and just upgrade the main breaker from a 125 to a 200a. Run new bigger wire(if needed) from the box to the meter box/plate and then have the elec co come and turn it on. Or do I need to buy an entire new 200a box for the house and install a NEW meter box/plate, wire it together. Then have the city move power to that box and then either a) move all the wires from the old box to the new box or just have a 125amp in the new box to power the old box and then also have a 100amp in the new box to power the garage?
This ended up being pretty long winded.
I may have answered my own question. But would it be best to install a new meter box and have that feed a small box that then feeds the garage and the already installed home box?
TIA,
Jake
I think the best idea would be to dig a trench and run 3 2awg wires in a conduit to a sub panel. It is only about 60' from the house to the garage and I am sure I could dig it by hand without too much trouble.
I want to run 100a to my garage. I plan to have a 220 compressor right away and will have a 220 welder and a lift in the years to come.
My house currently has a 125A service with a breaker box that is just about full. But does have room for a 100a 2 pole breaker.
I will have to upgrade the service to the house to 200a. I am farily knowledable in adding circuits and running wire, etc but have never done this before.
I spoke with the electric company and they said it is fairly easy from their side to upgrade the service. They will supply me with a meter box/plate and then when I am ready they will come and take care of everything outside. Upgrade wire from the poll if needed, at no charge.
So...what I am wondering is can I use my current breaker box and just upgrade the main breaker from a 125 to a 200a. Run new bigger wire(if needed) from the box to the meter box/plate and then have the elec co come and turn it on. Or do I need to buy an entire new 200a box for the house and install a NEW meter box/plate, wire it together. Then have the city move power to that box and then either a) move all the wires from the old box to the new box or just have a 125amp in the new box to power the old box and then also have a 100amp in the new box to power the garage?
This ended up being pretty long winded.
I may have answered my own question. But would it be best to install a new meter box and have that feed a small box that then feeds the garage and the already installed home box?
TIA,
Jake