bannerd
Well-known member
Hey all,
I'm building my own home which is post and beam. I'm trying to figure out the best layout for the electrician. Is it okay to lay EMT on top of the subfloor? The EMT will be raceways for lights and a TV. I was planning on MC wire but when I went to HD.. it just seems like it wouldn't stop a nail when I start to lay hardwood. Basically the EMT will be screwed into the subfloor and then plywood will fill the gaps(compensate the 1/2 EMT). On top of that there will be the final floor (hardwood), so there is a chance a nail could hit something.
This is for the basement which will be finished and will also be a workshop (finally) for me. I was going to run it through the timbers but after doing some lurking online it doesn't seem right to drill a hole in these beams.
My other option is onto of the timbers(routed) but still is risking a possible nail.
I'm building my own home which is post and beam. I'm trying to figure out the best layout for the electrician. Is it okay to lay EMT on top of the subfloor? The EMT will be raceways for lights and a TV. I was planning on MC wire but when I went to HD.. it just seems like it wouldn't stop a nail when I start to lay hardwood. Basically the EMT will be screwed into the subfloor and then plywood will fill the gaps(compensate the 1/2 EMT). On top of that there will be the final floor (hardwood), so there is a chance a nail could hit something.
This is for the basement which will be finished and will also be a workshop (finally) for me. I was going to run it through the timbers but after doing some lurking online it doesn't seem right to drill a hole in these beams.
My other option is onto of the timbers(routed) but still is risking a possible nail.