bratrastered
New member
- Joined
- Jun 13, 2025
- Messages
- 3
Got a new garage slab that has cured for 60 days, and I want to give it an epoxy finish. Don't hate on me, but I've got a Rustoleum EpoxyShield kit; my concern is about ambient temperatures and proper curing. Around here daytime high might be 70F and overnight low 50F. Instructions say "do not apply if temperature will dip below 65F for 24 to 48 hours." Well yeah, temps are definitely going to dip. Wondering if I'm hosed, or if the curing will just take a little longer?
