I finished my 25x25 detached garage last Wednesday with Sherwin Williams Tile Clad Product. I acid etched and then ground down the concrete followed by a pressure washer.
After a couple of days of drying, and an overnight moisture test with a plastic sheet taped to the floor, I did one coat (two kits, four gallons) of Tile Clad with the flakes added after the color was down. The next day I applied the final coat of ArmorSeal clear using two kits (4 gallons). After coating the entire floor once I still had close to a gallon left, so I went ahead and put the left over clear down until it was all gone.
I have a 2 ton Trane central HVAC unit with a gas furnace, six supplies and two returns. I have kept the temperature at 75 F from the beginning to present.
My concern is the floor doesn't seem to be curing to the proper hardness. I can walk on it but if I stick my fingernail into it I can see an indent left over. I'm afraid to start putting all the machinery and such back into the garage for fear of it not being cured enough. Any advise?
After a couple of days of drying, and an overnight moisture test with a plastic sheet taped to the floor, I did one coat (two kits, four gallons) of Tile Clad with the flakes added after the color was down. The next day I applied the final coat of ArmorSeal clear using two kits (4 gallons). After coating the entire floor once I still had close to a gallon left, so I went ahead and put the left over clear down until it was all gone.
I have a 2 ton Trane central HVAC unit with a gas furnace, six supplies and two returns. I have kept the temperature at 75 F from the beginning to present.
My concern is the floor doesn't seem to be curing to the proper hardness. I can walk on it but if I stick my fingernail into it I can see an indent left over. I'm afraid to start putting all the machinery and such back into the garage for fear of it not being cured enough. Any advise?