Hey guys! I almost pulled the trigger on an epoxy floor last year, when I happened on a smoking deal for a lift. So I got the lift instead. I plan to get it installed soon after I finish repainting it (had surface rust). This is a big 4 post lift with probably 10" square feet. What are your opinions on rolling in the epoxy after the lift is set in place?
I also have shelving mounted to some walls where angle iron hits the floor. I guess I could jack the shelving up and do a quick cut in around those feet.
I plan on using the Wolverine brand, they still seem to be the ones to beat.