fringeofinsanity
Well-known member
I've decided I want to go with an epoxy floor come spring, plan to buy the materials this week as they're on sale. I searched, but didn't see an answer to my question, and maybe it's answered in the instructions, but I have no patience. So here's my question....
I plan to do this in sections, but with work time and cure time, I don't see how I can get everything done in one application and have it cured in time to then roll my tools and benches, etc back in at the end of the day.
So... Can I do 1/2 the garage on one day, then after curing move my things to the other side to finish the rest. Are there any tips to blending, etc? Should I tape off the floor, then do the other side?
Any input from those that have experienced my dilemma is greatly appreciated.
I plan to do this in sections, but with work time and cure time, I don't see how I can get everything done in one application and have it cured in time to then roll my tools and benches, etc back in at the end of the day.
So... Can I do 1/2 the garage on one day, then after curing move my things to the other side to finish the rest. Are there any tips to blending, etc? Should I tape off the floor, then do the other side?
Any input from those that have experienced my dilemma is greatly appreciated.
